Technical Centre

Give project teams the information to specify with confidence.

Request technical information matched to the proposed equipment, controls and application.

Engineer reviewing technical information beside control and monitoring equipment

Project information

Documents matched
to the supplied system.

Technical information is issued against the product configuration and intended use so project teams receive the relevant values, interfaces and responsibilities.

01

Technical submittals

Configuration-specific product, electrical and control information supplied for the proposed system.

02

Controls and interlocks

A clear control narrative covering proving, enable conditions, alarms and safe shutdown.

03

Installation and commissioning

Project checks, handover records and acceptance criteria agreed for the supplied arrangement.

04

Safety and conformity

Applicable safety information and configuration-specific conformity records supplied with the equipment.

05

Warranty and service

Warranty scope, service route, consumables and maintenance responsibilities stated in the supply documents.

06

Planning inputs

Project information to support the wider ventilation and odour-control proposal without implying approval.

Consultant support

Kitchen planning
inputs.

We collect the cooking duty, airflow, filtration, duct route, discharge, controls and maintenance information needed to define the ozone stage within the complete extract strategy.

  • Project input schedule
  • Configuration-specific technical information
  • Control and interlock narrative
  • Commissioning requirements
Request project information

Product lifecycle

Records that
follow the unit.

Equipment identity, commissioning information and service history provide continuity from supply through maintenance.

  • Equipment identification
  • Configuration and production records
  • Commissioning checks
  • Service and calibration status where applicable
  • Safety and conformity records
Request project documents
Configuration matters.

Documents apply to the identified equipment and arrangement. They do not provide blanket approval for a different configuration or complete project.

Discuss document requirements