Safety centre

Control ozone exposure from setup to verified re‑entry.

Isolate the area, prove conditions, control output, ventilate, monitor and verify clearance under a competent site-specific plan.

Core principles

Design controls
around people.

HSE EH38 describes ozone health hazards and control measures. COSHH requires employers to assess risk and prevent or adequately control exposure.

01

Prevent access

Isolate the treatment area, control keys and access points, display warnings and plan for unauthorised entry.

02

Prove conditions

Use fan or airflow proving, interlocks and shutdown logic where ozone is tied to ventilation or extract operation.

03

Control the dose

Match output and treatment time to the assessed duty. Avoid uncontrolled or unnecessary generation.

04

Ventilate

Complete a defined purge and ventilation stage before anyone considers re-entry.

05

Monitor

Use a suitable, maintained monitoring method where the risk assessment requires it. Instrument range and placement matter.

06

Verify clearance

A timer, smell or assumed decay period is not a clearance decision. Define and record the project-specific basis for re-entry.

Exposure limits

Workplace limits are
not public clearance rules.

EH40 lists Great Britain workplace exposure limits and should be checked in its current edition. Workplace exposure limits concern occupational exposure averaged over a stated period. They should not be copied automatically into decisions for members of the public, sensitive occupants or re-entry after high-dose treatment.

A competent assessment should define the clearance criterion, measurement method, uncertainty, instrument response and who is authorised to release the area.

Open current EH40 information ↗

Professional treatment sequence

✓Assess the source and remove contaminated material

✓Clean before ozone treatment where relevant

✓Define the treatment boundary and secure access

✓Set equipment, dose and duration under a competent plan

✓Ventilate using the defined purge procedure

✓Monitor with suitable, maintained equipment

✓Record a verified clearance decision before re-entry

Engineered safeguards

Layer the controls.

No single interlock or sensor makes every use safe. Select safeguards using the hierarchy of control and the full failure scenario.

01Physical isolation
02Ventilation proving
03Modulated output
04Alarm indication
05Safe shutdown
06Relevant monitoring
07Optional destruction
08Commissioning records
Important limitation

This website provides general product and process information only. It is not a risk assessment, method statement, exposure-monitoring plan or substitute for competent health and safety advice.